| DAY 2
The
Instabuild frame is assembled, levelled
and bolted to the exterior wall. The modular
walls are then bonded and bolted to the
frame (not required if glass is going to
be full height).
These
walls come in various real clay brick, stone
or rendered finishes to match the existing
house. By the end of day 2 we are ready
to start the conservatory!
|